☰ Category

Analysis of Lead Time in Prototype Aircraft Manufacturing Environment

 

Marketed By :  LAP LAMBERT Academic Publishing   Sold By :  Kamal Books International  
Delivery in :  10-12 Business Days

 

Check Your Delivery Options

Product Out of Stock Subscription

(Notify me when this product is back in stock)

Rs. 2,675

Availability: Out of stock

 
  • Product Description
 
In prototype shops of Aircraft Industry minimizing the lead time is very important than minimizing the cost because long lead times requires planning, ahead of plant in all departments like personnel, equipment, material, purchase several months in advance of actual order in hand. As the longer lead time can cause to affect on accuracy of such plant. In prototype aircraft environment every downstream department activity needs the input from upstream department. And if it occur any kind of bottleneck in upstream department, the downstream department decides to go for another job which does not require the upstream input. And the scheduled job will be completed in a week or month rather than prescheduled date. The Q.R.M. redesigns the organization structure which works on the traditional methods of manufacturing or mindset, which works itself against the principles derived. And it suggests the new methods of manufacturing or principles such that the lead time can be controlled in order to control the cost as a consequence of it automatically.
Product Specifications
SKU :COC9710
AuthorAashish Gandigude and Madhva Nagarhalli
BindingPaperback
Number of Pages56
Publishing Year04/02/15
ISBN978-3659691300
Edition1 st
Book TypeProduction engineering
Country of ManufactureIndia
Product BrandLAP LAMBERT Academic Publishing
Product Packaging InfoBox
In The Box1 Piece(Paperback)
Product First Available On ClickOnCare.com2015-07-07 00:00:00
0 Review(s)