Call Us 080-41656200 (Mon-Sat: 10AM-8PM)
Free Shipping above Rs. 1499
Cash On Delivery*

Application of Kanban, Work Study & Simulation to Reduce High WIP

 

Marketed By :  LAP LAMBERT Academic Publishing   Sold By :  Kamal Books International  
Delivery in :  10-12 Business Days

 

Check Your Delivery Options

 
Rs. 5,066

Availability: In stock

 
  • Product Description
 

The objective of this book is to illustrate ways to reduce the numbers of work-in-process (WIP) at veneer lamination line using application of Kanban, work study and simulation. The main problem is the high work-in-process at hot press station. Besides that, the other problems that been identified and formulated was high rejection problem, poor production planning and scheduling and unbalanced cycle time. Different approach has been applied to overcome all of these problems. Just-In-Time (JIT) philosophy in terms of Kanban system (pull system) is the first approach to overcome the high WIP and rejection problem. Second approach is on the scheduling analysis of priority rules to overcome the poor planning and scheduling problem by comparing the existing rules of sequencing jobs by using EDD method with FCFS, SPT and LPT methods.The third approach to overcome the unbalanced cycle time is from the line balancing analysis by analysis by using the Ranked Positional Weight (RPW) method. To overcome the ineffective work motion, work study been used by using the Therbligs method. The final approach is by using the WITNESS simulation to simulate system.

Product Specifications
SKU :COC57332
AuthorMohamad Zairi Baharom and Wan Nazdah Wan Hussin
LanguageEnglish
BindingPaperback
Number of Pages188
Publishing Year2012-12-03T00:00:00.000
ISBN978-3659221927
Edition1 st
Book TypeProduction engineering
Country of ManufactureIndia
Product BrandLAP LAMBERT Academic Publishing
Product Packaging InfoBox
In The Box1 Piece
Product First Available On ClickOnCare.com2015-06-08 00:00:00