Category

Profit Optimization

 

Marketed By :  VDM Verlag Dr. Müller   Sold By :  Kamal Books International  
Delivery in :  10-12 Business Days

 
₹ 5,886

Availability: Out of stock

 

Delivery :

Product Out of Stock Subscription

(Notify me when this product is back in stock)

  • Product Description
 

A refrigerated gas plant (RGP) faces operational challenges on three fronts namely: 1) at the plant inlet, fluctuations in flow rate and composition caused by multiple feed gas streams; 2) within RGP, unscheduled shutdowns due to equipment malfunction; 3) at the outlet, strict product specifications enforced by the customers. These challenges force RGP to improve its efficiency in order to sustain profitability. An identified area for improvement is during operational planning. This type of planning poses a short-term and continuous scheduling problem in which preconfigured setpoints are directly implemented by regulatory controllers. While this practice is currently accepted, economic benefits can be further realized by frequent reevaluation of plant states through real-time optimization (RTO). Since scheduling is performed at a much larger time-scale (days-weeks) as compared with RTO (hours-days), integration of these two automation layers is difficult. This book discusses an efficient approach for integration of scheduling and RTO in the RGP.

Product Specifications
SKU :COC23639
Country of ManufactureIndia
Product BrandVDM Verlag Dr. Müller
Product Packaging InfoBox
In The Box1 Piece
0 Review(s)